Pre-Installation Checklist

1

Acclimatisation

Store flooring in the installation area for before installation to climatise. Maintain room temperature between 18-24°C and humidity between 35-65%.
2

Subfloor Preparation

Ensure subfloor is clean, dry, flat, and structurally sound. Maximum deviation of 3mm over 3m. Test moisture levels before proceeding.
3

Tools & Materials

Have all required tools ready: tapping block, pull bar, spacers, saw, measuring tape, pencil, and appropriate adhesive or fasteners.
Timber Installation
Solid Timber

Timber Installation

Secret nailing to timber subfloors or direct stick to concrete. Requires professional installation.

  • Nail-down or glue-down methods
  • Expansion gaps required
  • Not suitable for floating installation
Download Guide (PDF)
Engineered Installation
Engineered Timber

Engineered Installation

Versatile installation options including floating, glue-down, or nail-down depending on product and subfloor type.

  • Suitable for underfloor heating
  • Can be floated over underlay
  • Direct stick to concrete
Download Guide (PDF)
SPC Installation
SPC Hybrid

SPC Installation

Easy click-lock floating installation. DIY-friendly with minimal tools required. No adhesive needed.

  • Click-lock floating system
  • Install over most existing floors
  • Suitable for wet areas
Download Guide (PDF)